South Korean Base Metals Projects


Ubeong Base Metals Project


  • Over 70 high-grade, historical workings were identified at Chilbo prospect
  • Along strike of Kumho Zinc Mine, 10km to the west
  • Detailed ground magnetic survey has confirmed structural controls to mineralisation
  • Detailed soil sampling has confirmed zinc-silver and copper-gold zoning
  • Further ground geophysics and surface sampling underway
  • Ubeong Project fast-tracked for diamond drill targeting
  • Detailed IP geophysics completed
  • Diamond drill underway at Copperhead